http://dbpedia.org/ontology/Infrastructure/length
|
0.1396
|
http://dbpedia.org/ontology/abstract
|
トリシュリ水力発電所(Trishuli Hydropower Station)は、ネパールのヌワコット地区トリシュリバザールに位置するピーキング用の流水式水力発電所。
, Trishuli Hydropower Station is a peaking r … Trishuli Hydropower Station is a peaking run-of-river hydropower station located at Trishuli bazaar of Nuwakot district in Nepal. The intake of the plant lies in Rasuwa district. The plant was constructed in 1976 with an installed capacity of 21 MW (7 units, 3 MW each). The plant was overhauled in 1995 and upgraded to 24 MW (6 units, 3.5 MW each plus one unit of 3 MW). The project was developed jointly by the Government of India and the Government of Nepal. The project cost was INR 140 million. The annual energy generation is 163 GWh.Nepal Electricity Authority, a government-run organization, owns and operates this plant. Another power station Devighat Hydropower Station is a cascade project to this power station. The design flow is 45.66 m3/s and the rated head is 51.4 m.s 45.66 m3/s and the rated head is 51.4 m.
|
http://dbpedia.org/ontology/country
|
http://dbpedia.org/resource/Nepal +
|
http://dbpedia.org/ontology/description
|
Gravity
|
http://dbpedia.org/ontology/height
|
5
|
http://dbpedia.org/ontology/length
|
139.6
|
http://dbpedia.org/ontology/location
|
http://dbpedia.org/resource/Rasuwa +
, http://dbpedia.org/resource/Nuwakot_District +
|
http://dbpedia.org/ontology/openingYear
|
1967
|
http://dbpedia.org/ontology/owner
|
http://dbpedia.org/resource/Nepal_Electricity_Authority +
|
http://dbpedia.org/ontology/part
|
http://dbpedia.org/resource/Trishuli_Hydropower_Station__PowerStation__1 +
|
http://dbpedia.org/ontology/purpose
|
Power
|
http://dbpedia.org/ontology/river
|
http://dbpedia.org/resource/Trishuli_River +
|
http://dbpedia.org/ontology/status
|
o
|
http://dbpedia.org/ontology/thumbnail
|
http://commons.wikimedia.org/wiki/Special:FilePath/Trishuli%2Bhydropower.jpg?width=300 +
|
http://dbpedia.org/ontology/wikiPageID
|
64292982
|
http://dbpedia.org/ontology/wikiPageLength
|
2626
|
http://dbpedia.org/ontology/wikiPageRevisionID
|
1107697288
|
http://dbpedia.org/ontology/wikiPageWikiLink
|
http://dbpedia.org/resource/Category:Run-of-the-river_power_stations +
, http://dbpedia.org/resource/Nepal_Electricity_Authority +
, http://dbpedia.org/resource/Rasuwa +
, http://dbpedia.org/resource/Category:Hydroelectric_power_stations_in_Nepal +
, http://dbpedia.org/resource/Nepal +
, http://dbpedia.org/resource/Category:Buildings_and_structures_in_Rasuwa_District +
, http://dbpedia.org/resource/Devighat_Hydropower_Station +
, http://dbpedia.org/resource/Category:1967_establishments_in_Nepal +
, http://dbpedia.org/resource/Category:Gravity_dams +
, http://dbpedia.org/resource/Category:Dams_in_Nepal +
, http://dbpedia.org/resource/Francis-type +
, http://dbpedia.org/resource/Nuwakot_District +
, http://dbpedia.org/resource/Trishuli_River +
|
http://dbpedia.org/property/country
|
Nepal
|
http://dbpedia.org/property/damCrosses
|
http://dbpedia.org/resource/Trishuli_River +
|
http://dbpedia.org/property/damType
|
Gravity
|
http://dbpedia.org/property/location
|
http://dbpedia.org/resource/Nuwakot_District +
, http://dbpedia.org/resource/Rasuwa +
|
http://dbpedia.org/property/locationMap
|
Nepal
|
http://dbpedia.org/property/name
|
Trishuli Hydropower Station
|
http://dbpedia.org/property/opening
|
1967
|
http://dbpedia.org/property/owner
|
Nepal Electricity Authority
|
http://dbpedia.org/property/plantCapacity
|
24.0
|
http://dbpedia.org/property/plantCommission
|
1967
|
http://dbpedia.org/property/plantName
|
Trishuli Hydropower Station
|
http://dbpedia.org/property/plantTurbines
|
6
|
http://dbpedia.org/property/plantType
|
RoR
|
http://dbpedia.org/property/purpose
|
Power
|
http://dbpedia.org/property/status
|
o
|
http://dbpedia.org/property/wikiPageUsesTemplate
|
http://dbpedia.org/resource/Template:Infobox_dam +
, http://dbpedia.org/resource/Template:Reflist +
, http://dbpedia.org/resource/Template:Coord +
, http://dbpedia.org/resource/Template:Stack +
, http://dbpedia.org/resource/Template:Convert +
, http://dbpedia.org/resource/Template:Nepal-stub +
, http://dbpedia.org/resource/Template:GeoGroupTemplate +
, http://dbpedia.org/resource/Template:Portal +
|
http://purl.org/dc/terms/subject
|
http://dbpedia.org/resource/Category:Gravity_dams +
, http://dbpedia.org/resource/Category:Hydroelectric_power_stations_in_Nepal +
, http://dbpedia.org/resource/Category:Dams_in_Nepal +
, http://dbpedia.org/resource/Category:1967_establishments_in_Nepal +
, http://dbpedia.org/resource/Category:Buildings_and_structures_in_Rasuwa_District +
, http://dbpedia.org/resource/Category:Run-of-the-river_power_stations +
|
http://www.georss.org/georss/point
|
27.922745135301923 27.920560023272902
|
http://www.w3.org/2003/01/geo/wgs84 pos#geometry
|
POINT(27.920560836792 27.922744750977)
|
http://www.w3.org/2003/01/geo/wgs84 pos#lat
|
27.922744750977
|
http://www.w3.org/2003/01/geo/wgs84 pos#long
|
27.920560836792
|
http://www.w3.org/ns/prov#wasDerivedFrom
|
http://en.wikipedia.org/wiki/Trishuli_Hydropower_Station?oldid=1107697288&ns=0 +
|
http://xmlns.com/foaf/0.1/depiction
|
http://commons.wikimedia.org/wiki/Special:FilePath/Trishuli%2Bhydropower.jpg +
|
http://xmlns.com/foaf/0.1/isPrimaryTopicOf
|
http://en.wikipedia.org/wiki/Trishuli_Hydropower_Station +
|
http://xmlns.com/foaf/0.1/name
|
Trishuli Hydropower Station
|
owl:sameAs |
http://www.wikidata.org/entity/Q96410866 +
, http://dbpedia.org/resource/Trishuli_Hydropower_Station +
, http://ja.dbpedia.org/resource/%E3%83%88%E3%83%AA%E3%82%B7%E3%83%A5%E3%83%AA%E6%B0%B4%E5%8A%9B%E7%99%BA%E9%9B%BB%E6%89%80 +
, https://global.dbpedia.org/id/ByPzh +
|
rdf:type |
http://www.w3.org/2003/01/geo/wgs84_pos#SpatialThing +
, http://dbpedia.org/ontology/Dam +
, http://dbpedia.org/ontology/Infrastructure +
, http://www.wikidata.org/entity/Q12323 +
, http://dbpedia.org/ontology/ArchitecturalStructure +
|
rdfs:comment |
Trishuli Hydropower Station is a peaking r … Trishuli Hydropower Station is a peaking run-of-river hydropower station located at Trishuli bazaar of Nuwakot district in Nepal. The intake of the plant lies in Rasuwa district. The plant was constructed in 1976 with an installed capacity of 21 MW (7 units, 3 MW each). The plant was overhauled in 1995 and upgraded to 24 MW (6 units, 3.5 MW each plus one unit of 3 MW). The project was developed jointly by the Government of India and the Government of Nepal. The project cost was INR 140 million. The annual energy generation is 163 GWh.Nepal Electricity Authority, a government-run organization, owns and operates this plant. Another power station Devighat Hydropower Station is a cascade project to this power station.s a cascade project to this power station.
, トリシュリ水力発電所(Trishuli Hydropower Station)は、ネパールのヌワコット地区トリシュリバザールに位置するピーキング用の流水式水力発電所。
|
rdfs:label |
Trishuli Hydropower Station
, トリシュリ水力発電所
|